A trailer moving between bays
Home/Shop Time

A week in
the shop

Your shell is ordered from the factory to your spec. What happens after it lands in Napa is ours: five to ten days in a bay, depending on how much you asked for.

Stage
1234567
Shell in & prepDAY 1
INSPECT, STRIP, MEASURE
FabricationDAY 1–3
RACKS · STANDS · BRACKETS
InteriorDAY 3–5
WALLS · FLOOR · TOOL WALL
Fit-outDAY 4–6
BENCH · CABINETS · FUEL
ElectricalDAY 5–7
12V + 110V, LOAD TESTED
QC & handoverDAY 7
KEYS
3–5 mo
Ordering a fitted race trailer elsewhere
5–10 days
Our shop, once the shell is here
// Stage by stage

What actually
happens

Not a marketing timeline. This is what happens to your trailer between the day it lands in Napa and the day you tow it away.

01
Day 1

Shell in & prep

Your shell arrives from the factory built to the spec you signed off. First thing we do is go over it: every seam, every light, every latch, the floor, the ramp springs. Factory trailers are good but they are built fast, and it is far easier to sort a sticking lock now than with a tool wall bolted in front of it.

Anything wrong at this stage is the factory’s problem, not yours. We deal with them, not you.

02
Days 1–3

Fabrication

Racks, stands, brackets and the bench frame are cut, welded and powder-coated on our own bench, off the trailer. The cut list comes straight from the drawing you approved, so there is no step where somebody’s reading of “about four feet” becomes a problem.

Building this off the trailer rather than inside it is slower to set up and considerably more accurate — which is the whole point of the exercise.

03
Days 3–5

Interior

Wall and ceiling panels, insulation if you specified it, and the rubber coin floor laid over the sealed factory ply. Then the tool wall goes up, on the side opposite your door so you are not walking round a kart to reach a socket.

This is the week you are most welcome to drive up. Plenty of people move something twelve inches at this stage, and that is exactly what we are for.

04
Days 4–6

Fit-out

Kart stands set to your chassis height, tire racks to your compound, engine bench at the height you actually work at rather than a catalogue number, cabinets, fuel station, chocks. The part that turns a cargo box into a race trailer.

Every stand and rack is powder-coated in your team colours at no extra cost. The powder is the powder whatever colour it is.

05
Days 5–7

Electrical

12V and 110V looms, labelled end to end, fused and diagrammed. Shore power gets tested under real load rather than just checked for continuity, because a 50A inlet that reads fine on a multimeter can still trip with a compressor running.

You leave with the schematic. That matters if you are three states away and something needs attention on a Saturday.

06
Day 7

QC & handover

We walk the whole trailer together in the shop. Every latch, every circuit, every strap point, the factory warranty paperwork and ours. Then you get the schematic, the keys, and you tow it home.

Factory warranty on the shell, ours on everything we fitted. If something we built needs attention, it comes back to Napa.

07
Same week

Or we bring it to you

If you cannot get to Napa, one of us hitches your trailer to our truck and drives it to your door — then does the same walk-through in your driveway. We do not hand your build to a broker, a carrier or a driver we have never met. Free inside 100 miles, a dollar a mile after that.

The person who wired it is the person who delivers it. That is the only way the handover is worth anything.

// The obvious question

Why does everyone
else take months?

They are not, really. The actual metalwork on a race trailer is not a six-month job for anybody, including them. What takes six months is the queue.

A national manufacturer schedules four hundred units through a single production line. When you place an order you are not waiting for your trailer to be built — you are waiting for three hundred and eleven other trailers to be built first. Almost none of that time is work on your unit.

We sell slots instead of positions in a queue. There is a fixed number each month, and when you take one, your trailer occupies a bay from the day it lands until the final walk-through. Nothing displaces it. That is the whole trick, and it is why we cannot simply scale up without becoming the thing we are trying not to be.

What we give up to do it

Honesty requires the other side of this. We build a small number of trailers a year. If all the slots for a month are taken, you wait for the next month — and in a busy season that can be six or eight weeks before your shell even ships. We will always tell you the real date on the first call rather than after the deposit.

Three build bays in Napa, one trailer each
Three bays, deliberately not full — that is the whole point
// Getting it to you

We drive it ourselves.
A dollar a mile.

Every other shop hands your finished trailer to a transport broker and stops caring. We do not use carriers, brokers or third-party haulers at all — your trailer is towed to you by one of the five people who built it, at what we think is the lowest delivery rate in the country.

100 miFree delivery inside a hundred miles of the shop — the Bay Area, Sacramento, Sonoma, Stockton, the whole valley.
$1Per road mile beyond that, one way. No fuel surcharge, no per-diem, no brokerage fee, no season pricing.
0Third parties involved. Nobody outside this shop drives your trailer before you do.
48 statesWe have towed as far as it takes. If the road goes there, the rate is the same dollar.

What a dollar a mile actually means

A commercial carrier quoting a 24 ft enclosed trailer from Northern California to Los Angeles will normally come back somewhere between $900 and $1,400, plus a broker’s cut, plus a window of “sometime next week”. We charge $330, we tell you the day, and you get an hour of walk-through at the other end instead of a signature on a bill of lading.

The reason we can do it is the same reason everything else here is cheap: there is no middle. We are already driving to races most weekends. Your trailer is not a freight job we have to make a margin on, it is the last stage of a build we have been standing next to for a week.

The one condition

Delivery is scheduled, not instant. We tow it in the days after your handover date, around the race calendar. Tell us where you are on the first call and we will give you a date at the same time as the price — and if you happen to be racing the same weekend we are, we will simply bring it to the paddock and hand it over there.

From Napa toRoad milesDelivery
Sonoma Raceway25 miFree
San Francisco55 miFree
Sacramento60 miFree
Fresno230 mi$130
Los Angeles430 mi$330
Las Vegas570 mi$470
Portland, OR640 mi$540
Phoenix, AZ790 mi$690

One-way road miles, rounded. Your exact figure is confirmed in writing with the quote, before you pay anything. The configurator works it out for your own address →

Walking a finished trailer with the owner
The walk-through — every latch, every circuit, before the keys change hands